Do I need a permit to replace my roof?
In every city covered here, yes. A residential reroof requires a building permit, and the permit is issued by the city that contains the address. San Jose, Santa Clara, Sunnyvale, Campbell, Cupertino, Milpitas, Morgan Hill, Los Gatos, Saratoga, Gilroy, Los Altos, Mountain View and Fremont each run their own building department. Unincorporated addresses go to the County of Santa Clara. A repair is different from a replacement: Gilroy, for example, requires a permit for roof repairs that exceed 100 square feet, while a small patch may not need one. Ask the city, not the contractor's memory.
What is the difference between a tear-off and an overlay?
A tear-off removes the existing covering and exposes the sheathing, which lets the crew inspect and repair the deck before the new underlayment goes down. An overlay installs the new covering over the old one. Overlays are cheaper and faster, but they are limited by code and by weight. Gilroy allows an overlay over one existing layer and requires a pre-roof inspection before covering. Milpitas does not allow a new covering over existing wood shake, slate, clay, cement or asbestos-cement tile, or over two or more existing applications. On a tile roof, an overlay usually makes no sense because the underlayment, not the tile, is the failing layer.
My tile roof looks fine. Why is water coming in?
Because the tile is not the waterproofing. Concrete and clay tile shed most water, but the felt underlayment beneath them is the actual membrane, and it ages out long before the tile does. Once it is brittle and torn, water reaches the sheathing and the ceiling below while the tile still looks intact from the street. A tile roof at the end of its underlayment life needs a lift and re-lay or a full replacement, not a patch on the broken tiles.
How do I know whether to repair or replace?
Three things decide it: the age and condition of the underlayment or shingle mat, the extent of sheathing damage, and whether the failure is local or systemic. A single flashing leak on a roof with a sound covering is a repair. Granule loss across a whole slope with exposed mat, or tile over failed underlayment across most of the roof, is a replacement. The inspection has to look at the attic side and at a test opening, not only at the top surface.
Can you put a new roof over an old one?
Sometimes, and the rules are specific. A second layer adds weight, and most cities require the structure to be shown capable of carrying it. Gilroy sets a threshold of 7.5 pounds per square foot for the finished assembly and requires framing review above that. San Jose sets 7 pounds per square foot and requires rafter span tables or engineering calculations above it. Mountain View will not issue its reroof permit at all when a heavier covering pushes the assembly past 7.5 pounds per square foot. The material matters too: wood shake and tile usually have to come off.
What does a reroof permit require in my city?
It depends on the city, and the location guides record the specifics with a source link for each. As a pattern: most cities want the roof area in squares, the existing and proposed covering, the underlayment, the sheathing, and a statement of whether the old roof is removed or covered. Several cities require manufacturer instructions or an evaluation report on site at inspection. Some require a sheathing or nailing inspection before the roof is closed. A few require a smoke and carbon monoxide certificate at the final. Los Gatos requires a Class A fire rating on all roofs. Morgan Hill requires Class A in a Fire Hazard Severity Zone.
Who should pull the permit, me or the contractor?
The contractor should pull it. A permit can usually be issued to a contractor or to the property owner, but the two routes are not equivalent. An owner-builder permit makes the owner the responsible party for code compliance and for worker safety, and it can complicate a later sale or insurance claim. If a contractor asks you to take the permit out in your name so the crew can start sooner, that is a reason to ask more questions, not fewer.
How long does a permit take?
It varies by city and by whether the property carries an overlay. Santa Clara's simple permit route can issue instantly or within one to two business days. Los Altos processes plan submittals in two to four business days before routing. San Jose issues most reroofs online but sends Historic Resources Inventory properties to a walk-in counter with a project worksheet and prior Planning review. Los Gatos accepts applications only through its online portal. No honest answer goes beyond the city's own published service level.
My house is on a historic inventory. What changes?
In San Jose, a reroof on a Historic Resources Inventory property is treated as a minor exterior alteration under an HP Permit Adjustment, reviewed by Planning staff without a public hearing. It cannot use the online reroof permit. That adds a Planning step before the building permit can issue, and the material choice may be constrained by the property's character. Other cities have their own historic review triggers; the location guide for your city records what the building department publishes.
What is different about an Eichler or other low-slope house?
The roof is often the building envelope: low slope, wide overhangs, few penetrations, and a membrane or built-up assembly rather than a pitched covering. Failures concentrate at seams, at the perimeter termination and at any penetration, and ponding is a design issue as much as a material one. Cupertino excludes Eichler properties from its instant re-roof permit and requires a standard permit. Sunnyvale publishes separate heritage and Eichler design guidance. A low-slope roof also cannot be judged from the ground; it needs to be walked and the seams opened.
Is attic ventilation part of a roof job?
It should be. Campbell's reroof checklist requires the roof and attic to be properly vented and notes that roof vents may be required at inspection. Mountain View requires minimum cross ventilation under CRC 806.1. Ventilation is not decoration: it controls condensation and deck moisture, and an under-ventilated assembly can rot a new roof from underneath. If a proposal replaces the covering and leaves the ventilation exactly as it was, ask why.
How soon can a roof be replaced after a leak?
The leak should be stopped first, even if the permanent repair is a replacement. A temporary measure that keeps water out of the interior protects the sheathing, insulation and finishes while the scope and permit are sorted out. The replacement can follow as soon as the permit is issued. Starting a tear-off with rain forecast and no temporary protection plan is how a small leak becomes a ceiling, insulation and drywall claim.
What happens if the crew finds dry rot?
It gets documented and priced before it is covered. Rot is common at valleys, at chimney and skylight curbs, at fascia and at rafter ends, and it is usually invisible until the covering comes off. A proposal should state a per-sheet or per-linear-foot allowance for sheathing and fascia repair, and how the discovery will be photographed and approved. A bid with no rot allowance is not a fixed price; it is a price for the easy part of the job.
Do solar panels have to come off?
If the array sits on the area being replaced, yes, and the removal and reinstallation may need a separate permit. Gilroy states that removal and reinstallation of rooftop equipment such as solar photovoltaic, solar heating or HVAC may require a separate permit and inspection before the roof is covered. That sequencing has to be planned before the tear-off, not discovered on the day.
Will my insurance cover a roof replacement?
Sometimes, and the distinction is usually between wear and a sudden event. Deterioration from age is a maintenance issue. Damage from a wind event, a falling limb or an impact may be covered, depending on the policy. The useful work is documentation: dated photographs, the interior damage, the inspection findings and a written scope that separates wear from event damage. This site does not give coverage advice, and no contractor can promise an adjuster's decision.
What should a roofing contract include?
The measured area, the existing covering, whether it is removed or recovered, the sheathing specification, the underlayment product and weight, the flashing details, the ventilation, who pulls the permit, the disposal, the protection of landscaping and access, the payment schedule, and the procedure for changes found during the work. California requires a written home improvement contract above a threshold set by statute, and the down payment is limited by statute as well. Check the current rules with the Contractors State License Board before you pay anything.
How do I check a contractor?
Use the Contractors State License Board lookup for the license number and its classification, and check that the classification matches roofing work. Ask for a certificate of insurance from the insurer. Ask for the permit number once it is issued, and confirm it with the city. Ask for references on nearby streets with similar roofs, and ask whether those jobs needed sheathing repair. A contractor who answers all four clearly is giving you more than a price; they are giving you a way to verify the work.
What should I do right now if water is coming in?
Move what you can away from the leak, put a container under the drip, and if the ceiling is bulging, stay out of the room and shut off power to that area. Do not climb on a wet roof. Photograph the interior damage and keep the receipts for anything you have to replace. Then call for a repair and ask for a temporary weatherproofing plan if the permanent fix cannot happen immediately. The interior damage is usually more expensive than the roof repair, so stopping the water is the first priority.